An extension is one of the biggest projects most people take on at home. A clear understanding of permissions, design and contracts at the start makes the build far less stressful.
Home › Guides › How to choose a house extension builder in Bromley
Some extensions can be built under permitted development without a full planning application, but there are limits on size, height and position, and they do not apply to flats and in many conservation areas. Bromley has areas with extra restrictions, so check current requirements. A Lawful Development Certificate can confirm that your plans are allowed, which helps when you sell.
Almost all extensions need Building Regulations approval, covering foundations, structure, insulation, fire safety, drainage and ventilation. This is separate from planning. Building Control inspects at stages, and you should receive a completion certificate at the end. Ask your builder who deals with this and how it is paid for.
You may need an architect or designer, and a structural engineer will calculate beams and foundations. Architects can be checked on the Architects Registration Board register. If you build on or near a shared boundary, the Party Wall etc. Act 1996 may require notices to neighbours, so take advice early.
Look at similar projects they have completed and speak to past clients if possible. Trade bodies such as the Federation of Master Builders and schemes like TrustMark may be relevant, but check what each one covers. Use a written contract with the scope, programme, payment stages and how changes are agreed, rather than a one-line quote.
Be wary of large upfront payments and instead link payments to stages of work completed. Ask the builder for public liability and contract works insurance, and check how your own home insurance is affected. Ask whether there is an insurance-backed warranty or guarantee, and keep a contingency for unexpected costs.
It depends on size, design and the approvals process. Ask for a written programme, and expect design and permissions to take time before building.
Not always, but it depends on how your home is affected. Ask the builder about dust, noise, services and access.
Possibly, if the scope changes or unforeseen issues arise. Agree how variations will be priced and approved in writing.
Not always. A designer or architectural technologist can produce the drawings, and some builders offer design and build. Ask who is responsible for planning and Building Regulations drawings.
Yes. Tell both before work starts, since the building may be covered differently while work is in progress.
See the three vetted Bromley businesses on our House extension builder page, or look at local options in Penge and Keston. Related guides: Builder, Structural engineer, Loft conversion company. Where planning, building control or other council rules may apply, start with Bromley Council’s planning and building control pages.
Before work starts, read MyBromley’s Bromley Council rules for home projects and conservation areas in Bromley, or see local trades and services in Bromley.
MyBromley Services lists three local businesses for each trade, free for residents. Or call us on 0208 138 1033 and we will point you to the right person.
This guide is general information, not legal or building advice, so confirm planning, Building Regulations and party wall requirements for your own property.