Demolition looks simple but it carries real risks to workers, neighbours and the public, from asbestos to unstable structures. A careful contractor will talk about surveys, notices and waste before they talk about price.
Home › Guides › How to choose a demolition contractor in Bromley
Older buildings may contain asbestos in places such as ceilings, boards, flooring and pipe lagging. Before demolition or major refurbishment, a specialist survey is normally needed, and licensed work must be done by an HSE-licensed contractor. Ask who carried out the survey and how any asbestos found will be removed and disposed of.
Demolishing a building generally requires notifying the local authority, and in Bromley that means Building Control, so ask the contractor to confirm current requirements. You may also need planning consent, especially in conservation areas or for listed buildings. If you share a wall with a neighbour, the Party Wall etc. Act may apply, so take advice early.
Gas, electricity, water and drainage should be properly disconnected and capped before work begins, and each supplier must be contacted. Ask how the site will be fenced, how dust and noise will be controlled and what happens if a skip or equipment is on the road, as the council may need to license it. For larger jobs, ask who is responsible under the construction health and safety regulations.
A lot of waste is created, and the contractor needs to carry it legally. Ask to see their waste carrier registration with the Environment Agency and for waste transfer notes showing where it went. The National Federation of Demolition Contractors is a recognised trade body, though membership is one of several things to check.
Ask for proof of public liability insurance suitable for demolition and employer's liability if they have staff, and check the policy actually covers this type of work. Quotes should state what is included, what is left behind, such as foundations or hardstanding, and how unexpected finds like asbestos will be priced.
It is good practice, and legally you may need to give notice if party wall matters arise. Tell them about timing, noise and access.
It varies, so agree in writing whether you or the contractor will do it. Either way, make sure it is done before work starts.
Not necessarily. Check whether foundations, slabs, services, clearance and waste disposal are all included.
Small structures are sometimes exempt from notice rules, but asbestos, services and neighbours still matter. Take advice from the council or a professional first.
It depends on the building and its location. Conservation areas, listed buildings and the redevelopment itself can all need approval.
See the three vetted Bromley businesses on our Demolition contractor page, or look at local options in Penge and Keston. Related guides: Skip hire company, Groundworks and foundations contractor, Rubbish clearance service. Where planning, building control or other council rules may apply, start with Bromley Council’s planning and building control pages.
Local reading from MyBromley: living in Bromley and local trades and services in Bromley.
MyBromley Services lists three local businesses for each trade, free for residents. Or call us on 0208 138 1033 and we will point you to the right person.
This guide is general information, not legal or health and safety advice, so confirm notices and permissions with the council. If you suspect asbestos, stop work and do not disturb it.