Typical electrician rates
These are national figures from UK cost guides, checked in November 2026. In Bromley, as in the rest of London and the South East, expect prices towards the top of each range.
- Hourly rate: about £45 an hour nationally, rising to around £60 in London and the South East.
- Day rate: roughly £225 to £335, depending on the guide and the area.
- Call-out fee: commonly £80 to £150. Some electricians charge a minimum first hour instead.
- Out-of-hours or emergency work: often £75 to £125 an hour, or a surcharge of 25 to 50% on top of the normal rate.
What common jobs cost
Which? surveyed its Trusted Traders in late 2025 and the figures below include labour and materials but not VAT:
- Replacing a light fitting (you supply it): about £50 to £200
- Fitting a dimmer switch: about £30 to £100
- Two extra double sockets in a living room: about £125 to £450
- Outdoor power socket: about £100 to £500
- Outside security light with sensor: about £150 to £650
- New fuse box / consumer unit (3-bed semi): about £500 to £1,500
- Electrical inspection report (EICR) for a 3-bed semi: about £100 to £330
- Full rewire of a 3-bed semi: about £4,000 to £18,000, taking 6 to 10 days
What changes the price
- Chasing cables into walls. Hiding new cables in the plaster takes longer and usually means some replastering and redecorating afterwards.
- The age of the wiring. Older houses can throw up surprises once the covers come off, and the electrician may find faults that need fixing before they can sign the job off.
- Access. Lofts, under-floor runs and long cable routes add time.
- Certification. Bigger jobs, such as a new circuit or consumer unit, have to be tested and certified. That paperwork is part of the job, so it should be in the quote.
- Whether the house is lived in. Rewiring an occupied home takes longer than an empty one, so it costs more.
How to avoid cowboys
- Use a registered electrician. In England, a lot of home electrical work must meet Part P of the Building Regulations. The simplest way is to use an electrician registered with a competent person scheme such as NICEIC or NAPIT, who can self-certify the work. You can check registration on the Electrical Competent Person register.
- Ask for the certificate. For new circuits and consumer units you should get an Electrical Installation Certificate, and the work should be notified to building control. Keep the paperwork, because you will need it when you sell.
- Get a written quote that says what is included: materials, making good, testing and VAT.
- Check insurance before work starts.
- Be careful with upselling. If you rang about one tripping circuit and are told the whole house needs rewiring today, get a second opinion.
- Bromley Council's Trading Standards "TS Checked" scheme lists local traders who have been checked, which is worth a look.
Find an electrician in Bromley
We list a small number of checked local electricians, not endless pages of results. See electricians in Bromley or call us on 0208 138 1033.
Common questions
How much does an electrician charge per hour?
Around £45 an hour on average across the UK, and nearer £60 in London and the South East. Out-of-hours rates are higher.
How much does an EICR cost?
For a typical three-bedroom semi, around £100 to £330 plus VAT. Smaller flats are cheaper and large houses cost more, because the test takes longer.
How much does it cost to rewire a house?
It varies a lot with size and how much plastering is needed. Which? puts a three-bed semi at roughly £4,000 to £18,000.
Can I do my own electrical work?
Small like-for-like jobs, such as swapping a light switch, are often allowed, but new circuits, consumer units and work in bathrooms usually need to be notified. If in doubt, use a registered electrician.
Do electricians charge a call-out fee?
Many do, typically on top of the first hour. Ask when you book so it isn't a surprise.
Next steps
Not sure who you need? Browse all trades and services, read our guides to choosing a trade, or call us on 0208 138 1033 and we will point you to the right person.
Prices are general guidance only, from national cost guides checked in November 2026. They are not quotes. Always get a written price first.